Government Sector
Compliant procurement, full regulatory alignment, and transparent, auditable supply chains.
Real-world case studies — from targeted equipment delivery to full-scale digital transformation.
Compliant procurement, full regulatory alignment, and transparent, auditable supply chains.
High-volume delivery, seamless IT-landscape integration, and consistent quality standards.
Continuous availability, fault tolerance, and hardened security for essential services.
Bespoke equipment, custom fabrication, and exacting quality requirements.
High-tech equipment sourced through a vetted international partner network under Government Resolution No. 506.
Federal level · IT infrastructure · three regions, zero deficiencies at acceptance
Servers, networking, and peripherals — all sourced from the domestic products registry. We prepared tender documentation, managed the 44-FZ contract, and delivered across three regions.
Industry · Sovereign IT migration · 620 workstations, −35% TCO by year three
Full infrastructure audit and a migration roadmap engineered for zero production downtime. Domestic servers, virtualization, registry-approved software, and hands-on staff training.
Critical infrastructure · Energy · cybersecurity across 14 CII sites
Assisted the client with CII asset categorization and FSTEC-compliant threat modeling. Supplied and deployed NGFW, IDS/IPS, and SIEM. Helped build incident-monitoring workflows, response procedures, and regulatory documentation.
Industry · ICS/SCADA · segmentation and security controls per FSTEC
Comprehensive industrial-network survey and ICS segment isolation. Deployed data diodes and industrial firewalls. Assisted the client in developing a FSTEC-aligned threat model and full organizational documentation.
Regional · Telecom · resilient server site, 99.9% target availability
Supplied servers, networking gear, UPS, and precision climate control. Installed structured cabling with link redundancy, deployed backup systems, and documented disaster-recovery procedures.
CII · Industry · SCADA migration with no process shutdown
Phased migration of dispatch control to domestic software — without a single process interruption. Protocol adaptation, controller integration, staff training, and 60 days of parallel-system operation.
Corporate client · Digitization · request cycle 14→3 days, −18% procurement spend
Analyzed procurement and inventory flows across 30+ divisions. Built a domestic platform with 1C and EDI integration and real-time executive dashboards.
Special project · Communications · ruggedized build, 72-hour autonomous operation
Selected and integrated computing and communications modules in ruggedized, climate-sealed enclosures mounted on a vehicle chassis. Autonomous power system, full acceptance testing at the client’s site.
Special project · Industry · one-off bench, ±0.5% measurement accuracy
Designed and assembled a bench simulating industrial-controller behavior under load. Custom enclosure fabrication, precision calibration, product passport, and warranty service — all included.
Special project · Laboratory · 48 instruments, zero-deficiency commissioning
Selected and supplied analytical and measurement instruments — spectrometers, chromatographs, and mechanical testers. Installed fume hoods, commissioned all equipment, calibrated every instrument, and delivered complete commissioning documentation.
Corporate client · Telecom · 23 sites in 62 business days, < 2% plan deviation
One master specification, split by delivery address, with carrier selection optimized for cost and speed. Centralized tracking and weekly progress reports.
Financial sector · Server import substitution · 48 servers, zero P1 incidents in migration
Benchmarked and selected domestic server alternatives. Phased deployment of 48 servers with parallel operation and SLA-backed support throughout.
Oil & gas · Strategic sites · 212 units in 41 days, no process stops
Replaced 200+ industrial networking devices after a Western vendor withdrew from the market. Built an alternative shortlist, negotiated with seven suppliers, and fast-tracked delivery to strategic facilities.
Government sector · Healthcare · 18 facilities in 90 days, 4-hour SLA
Defined a unified workstation standard. Delivered 1,400+ pre-configured, labeled units. On-site commissioning at every facility, backed by a 4-hour SLA hotline.
Parallel import · Industry · logistics via Turkey, Russian Gov. Resolution No. 506
Conveyor line for chemically resistant polyethylene production. Sourced through a partner in Turkey, shipped in a dedicated container with bonded-warehouse transit storage. Managed the full international logistics chain.
Parallel import · Energy · end-use certification, export permit, clean acceptance
Automatic argon-arc orbital welding heads under restricted-application controls. We negotiated with the manufacturer, prepared end-use certificates, coordinated with partner-country authorities, and secured the export permit through proper channels.
Parallel import · Energy · transit via Turkey, −15% customs costs
Turbine blades sourced from Germany. We identified compatible components, assembled the technical documentation, prepared end-use certificates, and routed procurement through Turkey with optimized customs duties.
Project details are published in anonymized form in accordance with our confidentiality agreements.
PROJEKTS.RF delivers end-to-end implementation — from analysis and architecture through procurement, deployment, and long-term support.
Get in Touch